Track lighting is up in the closet. The ceiling tile is about 80% done. Hotub about 50% drained. Wee


Track lighting is up in the closet. The ceiling tile is about 80% done. Hotub about 50% drained. Weekend tally: 0/2 items complete.


Leave a Reply

Your email address will not be published.